Jump to content

Callum Wilson behind schedule; set to return to full training within 'a few weeks' (Howe)


Strawberry

Recommended Posts

Don’t mind the offsides with him either because it only takes 2 or 3 of the 6-7 runs he gets in to be right and we’re in. Worth it imo.

Link to post
Share on other sites

Lengthy injury lay off and he comes back into the side brimming with confidence. He’s unshakeable in his own self belief and ability, and I hope he manages to stay fit because he will propel us forward big style. 

Link to post
Share on other sites

8 minutes ago, jonny1403 said:

I don't mind Wood but we would have lost that yesterday if he had started in Wilson's place.

I think thats a bit unfair, you could also say that had we started Gayle in Woods place since January we wouldnt have won any of those games either. Wilson without doubt has a massive upside on Wood, on ability and being suited to this side/the style Howe has them playing but using Wilson being better as stick to beat Wood with is harsh [emoji38] 

 

You might be right mind, Wilson did make a huge difference last night. 

 

 

Edited by Nine

Link to post
Share on other sites

4 hours ago, Minhosa said:

I love that he's also a right shithouse.

 

That blocking of Ramsdale's distribution, winding up their centre backs etc but the funniest thing, if you watch the second goal back, is he goes down looking for a pen and acting hurt. When the ball hits the net, he's up like lightning [emoji38] and celebrating.

 

Our shithouse.

 

Very Shearer-esque 

Link to post
Share on other sites

Loved his performance last night even the shithouse bits of it. 

 

So aggressive in chasing the ball down as well, he was a nightmare for the Arsenal centre halves, it would be great if he can stay fit next season.

 

 

Link to post
Share on other sites

2 minutes ago, Kid Icarus said:

Can't remember who it was, but whoever was saying that Ba was a better, more complete striker than Wilson is having a laugh like. 

 

 

 

Steady 

Link to post
Share on other sites

Ba was awesome. Something like one in two when played up front and he still brought loads the few months he was put out wide to accommodate Cisse.

Link to post
Share on other sites

Guest HTT II
6 minutes ago, Kid Icarus said:

Can't remember who it was, but whoever was saying that Ba was a better, more complete striker than Wilson is having a laugh like. 

 

 

 

Nah, Ba was better IMO!

Link to post
Share on other sites

4 minutes ago, Kid Icarus said:

Behind only Cabaye as the most overrated player of the Ashley era. He was quality, but there's some serious rose-tinted glasses with him among our fans imo. 

 

Strong disagree [emoji38]

Link to post
Share on other sites

4 minutes ago, Kid Icarus said:

Behind only Cabaye as the most overrated player of the Ashley era. He was quality, but there's some serious rose-tinted glasses with him among our fans imo. 


Eh? :lol:

 

Probably 2 of very few who’d slot into the Keegan & Robson squads from the last 18 years for me.

Link to post
Share on other sites

1 hour ago, Nine said:

I think thats a bit unfair, you could also say that had we started Gayle in Woods place since January we wouldnt have won any of those games either. Wilson without doubt has a massive upside on Wood, on ability and being suited to this side/the style Howe has them playing but using Wilson being better as stick to beat Wood with is harsh [emoji38] 

 

You might be right mind, Wilson did make a huge difference last night. 

 

 

 

 

I'm not talking about any of the other games (in which I thought Wood has played an important role). I'm talking specifically about Wilson's performance last night.

Link to post
Share on other sites

Guest HTT II
7 minutes ago, Kid Icarus said:

Behind only Cabaye as the most overrated player of the Ashley era. He was quality, but there's some serious rose-tinted glasses with him among our fans imo. 

Mental takes…

Link to post
Share on other sites

6 minutes ago, Kid Icarus said:

I honestly don't get it like. How on earth would Demba Ba be getting in the Keegan or Robson teams? :lol:


Cabaye is better than Jenas & Speed were for starters like, and Lee Clark pre-David Batty.

 

Ba’s goal record is crazy for us as a number 9 as well. As a centre-forward he scored 29 Premier League goals in 41 appearances. 

 

 

Edited by Optimistic Nut

Link to post
Share on other sites

6 hours ago, Minhosa said:

I love that he's also a right shithouse.

 

That blocking of Ramsdale's distribution, winding up their centre backs etc but the funniest thing, if you watch the second goal back, is he goes down looking for a pen and acting hurt. When the ball hits the net, he's up like lightning [emoji38] and celebrating.

 

Our shithouse.

His game IQ is next level, it also stopped him interfering with play and getting caught offside.

Link to post
Share on other sites

30 minutes ago, Optimistic Nut said:


Cabaye is better than Jenas & Speed were for starters like, and Lee Clark pre-David Batty.

 

Ba’s goal record is crazy for us as a number 9 as well. As a centre-forward he scored 29 Premier League goals in 41 appearances. 

 

 

 

Fair enough. When you're saying Keegan and Robson's teams I'm thinking of the finished best XI tbh, that's why I'm saying neither get in and, apples and oranges but Cabaye wasn't better than Speed for me, definitely not.

 

 

 

 

 

 

Edited by Kid Icarus

Link to post
Share on other sites

I just remember for a lot of the time after the 4th placed finish the fans calling for him to be replaced. Different sort of midfielder but Cabaye measures up to him for me. Up until Ben Arfa got in the team and Cisse arrived, Coloccini, Cabaye & Ba were our 3 class acts keeping us within the top 4 chase. 

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...