Jump to content

Callum Wilson behind schedule; set to return to full training within 'a few weeks' (Howe)


Strawberry

Recommended Posts

First time seeing him for 90 with us. Very impressed, quick and clever. Mark of a good player is not being in the game for huge periods but still being switched on and dangerous, you can see he'd have been ready for a late chance if it came. Then again, the way we play, it doesn't happen much. Good player though :thup:

Link to post
Share on other sites

It was mentioned today that if someone offered £30 million for him Ashley would take it, I could definitely see a Leicester, Everton or even Wolves stumping up that to push them on and that would leave us royally in the shit. 

Link to post
Share on other sites

It was mentioned today that if someone offered £30 million for him Ashley would take it, I could definitely see a Leicester, Everton or even Wolves stumping up that to push them on and that would leave us royally in the shit. 

 

Would do a job for Arsenal

Link to post
Share on other sites

Hard to judge him. He’s scoring the tap-ins and he’s putting away his penalties. Whether he’d do more at a better club, who knows. We might be making him look better than he is in that he’s so isolated you can’t really tell if he’s that good or not all round.

Link to post
Share on other sites

It was mentioned today that if someone offered £30 million for him Ashley would take it, I could definitely see a Leicester, Everton or even Wolves stumping up that to push them on and that would leave us royally in the shit.

 

Leicester could do worse as a replacement for Vardy.

Link to post
Share on other sites

  • 2 weeks later...

Probably his worst game for us.

 

Missed a couple of sitters and couldn't control anything.

 

They weren't sitters like, I thought he did ok considering it was basically him vs Sheffield's back four.

Link to post
Share on other sites

He still had moments when he tried to do things on his own.

 

It was worrying when his Bournemouth stats were brought up showing he only plays consistently well when he has a strike partner and it defo looks like that is what he needs right now

Link to post
Share on other sites

Guest neesy111

He's poor in the air I've noticed.  Missed quite a few easy chances in the air.

 

 

He's easily the reason how we've got to 19 points though.

Link to post
Share on other sites

Probably his worst game for us.

 

Missed a couple of sitters and couldn't control anything.

 

They weren't sitters like, I thought he did ok considering it was basically him vs Sheffield's back four.

 

 

Agree. With that formation, with that line up, with that manager he was always fighting a losing battle.

Link to post
Share on other sites

He still had moments when he tried to do things on his own.

 

It was worrying when his Bournemouth stats were brought up showing he only plays consistently well when he has a strike partner and it defo looks like that is what he needs right now

 

For all the stick Joelinton gets, Wilson is in the game a lot more when he's in there with him. He's got no striker instinct but he's decent at linking up play.

Link to post
Share on other sites

Set up to fail. Can't expect him to bury every half chance. The longer he's feeding off scraps the tougher it will be for him to rise above it and sneak something in.

 

Again another game where we've failed to get in behind a defence, get any planned quality service to him, or even played in to him so he can run channels.

 

Just hurled footballs at all evening long, all at varying angles, heights and accuracy.

Link to post
Share on other sites

He looks completely fed up and demoralised now. Given he's our only goalscoring threat when last season we had none and had to rely on defenders goals keeping us up, this puts us in real, real trouble for the rest of the season.

Link to post
Share on other sites

The poor sod has now resorted to throwing himself on the floor out of desperation to just get us the opportunity to get the ball into the box, as we can barely manage it in open play. Sad state of affairs.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...