MrRaspberryJam Posted May 26, 2022 Share Posted May 26, 2022 I love Callum Wilson. Link to post Share on other sites More sharing options...
huss9 Posted May 26, 2022 Share Posted May 26, 2022 aye, he's lush. Link to post Share on other sites More sharing options...
toon25 Posted May 26, 2022 Share Posted May 26, 2022 I love Callum, but I'd be shitting a brick if we didn't bring someone else in to compete with him. I don't want the anxiety of fucking about with going down again Link to post Share on other sites More sharing options...
Happinesstan Posted May 27, 2022 Share Posted May 27, 2022 20 hours ago, madras said: TBF the player takes a lot of the blame for the situation as well. Hmm. I'm willing to accept that he just delayed them coming, until he was settled. Probably the reason they're still there is because he saw what a shitshow the club was and wasn't prepared to commit his family. Link to post Share on other sites More sharing options...
MrRaspberryJam Posted May 27, 2022 Share Posted May 27, 2022 12 hours ago, toon25 said: I love Callum, but I'd be shitting a brick if we didn't bring someone else in to compete with him. I don't want the anxiety of fucking about with going down again I'd heard you had a nervous breakdown. Link to post Share on other sites More sharing options...
Hanshithispantz Posted June 5, 2022 Share Posted June 5, 2022 Since it's fucking Hot Takes Central from Hans this week, Calum Wilson will score 20+ goals this season. Link to post Share on other sites More sharing options...
Tiresias Posted June 5, 2022 Share Posted June 5, 2022 Randomly saw he does a podcast with michail antonio listened to latest one, nothing on there of particular interest and if honest none of them particularly insightful on anything (just a bit of a 'bantz' pod by sounds of it, but was nice how he insisted on his votes for end of season awards to bruno, big joe and eddie howe despite being ribbed for only nominating from his own team Link to post Share on other sites More sharing options...
nufcjb Posted July 1, 2022 Share Posted July 1, 2022 (edited) Bit worried for the lad. Can he still put the ball in the back of the net this season? Seems he can't even drink his cuppa properly these days. Coffee stained Mags. Edited July 1, 2022 by nufcjb Link to post Share on other sites More sharing options...
Guest Posted July 1, 2022 Share Posted July 1, 2022 I’m going with 17 league apps… Link to post Share on other sites More sharing options...
SiLvOR Posted July 1, 2022 Share Posted July 1, 2022 He absolutely shouldn't be trying that shit Link to post Share on other sites More sharing options...
Coffee_Johnny Posted July 4, 2022 Share Posted July 4, 2022 Read these stats in The Mirror: ”Wilson signed for the Magpies in September 2020 for around £20m, and has since gone on to register 20 goals and five assists in 44 top flight outings during his two-season stay. ” Imagine how excited we’d be signing someone new who had that kind of return in the Premier League? Link to post Share on other sites More sharing options...
STM Posted July 4, 2022 Share Posted July 4, 2022 He's absolute worth a two year extension, even with his injury record. Eventually he will be our back up striker and who better? Link to post Share on other sites More sharing options...
ponsaelius Posted July 4, 2022 Share Posted July 4, 2022 He's got two years left. Leave it for now IMO. Link to post Share on other sites More sharing options...
NWMag Posted July 4, 2022 Share Posted July 4, 2022 It’s so frustrating because as we saw in the Arsenal game, when he’s fit he’s one of the best strikers in the league IMO Link to post Share on other sites More sharing options...
The Butcher Posted July 4, 2022 Share Posted July 4, 2022 He's 30 and with his injury record? Stay fit for an entire season and then we'll talk. Wouldn't give him a new deal now. Link to post Share on other sites More sharing options...
Mazzy Posted July 4, 2022 Share Posted July 4, 2022 In his 6 seasons at Bournemouth he played over 25 times in 4 of them and 30 or more in 3 of those 4. 26 is the most appearances he's had in a season with us. So perhaps Howe will have a plan in place for him, to keep him fit for longer and injury free as much as possible. Not having to rely on him to play 90minutes whenever he is avaible because we actually have another capable ST or 2 will also play a big part. Link to post Share on other sites More sharing options...
The College Dropout Posted July 4, 2022 Share Posted July 4, 2022 24 minutes ago, Coffee_Johnny said: Read these stats in The Mirror: ”Wilson signed for the Magpies in September 2020 for around £20m, and has since gone on to register 20 goals and five assists in 44 top flight outings during his two-season stay. ” Imagine how excited we’d be signing someone new who had that kind of return in the Premier League? 44 appearances in 2 years because of injury? Link to post Share on other sites More sharing options...
OCK Posted July 4, 2022 Share Posted July 4, 2022 On 01/07/2022 at 19:28, Optimistic Nut said: I’m going with 17 league apps… ... he's got no knees. Link to post Share on other sites More sharing options...
The College Dropout Posted July 4, 2022 Share Posted July 4, 2022 9 minutes ago, ponsaelius said: He's got two years left. Leave it for now IMO. I'd leave it for 12-18 months at least. Sort something semi-last minute. Link to post Share on other sites More sharing options...
Guest Posted July 4, 2022 Share Posted July 4, 2022 25 minutes ago, Coffee_Johnny said: Read these stats in The Mirror: ”Wilson signed for the Magpies in September 2020 for around £20m, and has since gone on to register 20 goals and five assists in 44 top flight outings during his two-season stay. ” Imagine how excited we’d be signing someone new who had that kind of return in the Premier League? We’ve been linked with one who has a similar record and is younger and a lot of people don’t rate him and are scared off by his injury record. Link to post Share on other sites More sharing options...
The College Dropout Posted July 4, 2022 Share Posted July 4, 2022 1 minute ago, Optimistic Nut said: We’ve been linked with one who has a similar record and is younger and a lot of people don’t rate him and are scared off by his injury record. It's more because he scores headers and is not known for his speed. That part of the game is unfashionable. Link to post Share on other sites More sharing options...
prefabtoon Posted July 4, 2022 Share Posted July 4, 2022 (edited) Hopefully Eddie Howe can manage Wilson a lot better than Bruce. And it looks as though our back room staff and equipment are being improved, I think Bruce's idea of Getting fit for football was simply going out and running multiple miles. Edited July 4, 2022 by prefabtoon Link to post Share on other sites More sharing options...
Dr.Spaceman Posted July 4, 2022 Share Posted July 4, 2022 This is it, we're going to start the season on much better shape (literally) too, so less likely to lose players to injury as a result. Link to post Share on other sites More sharing options...
The College Dropout Posted July 4, 2022 Share Posted July 4, 2022 5 minutes ago, prefabtoon said: Hopefully Eddie Howe can manage Wilson a lot better than Bruce. And it looks as though our back room staff and equipment are being improved, I think Bruce's idea of Getting fit for football was simply going out and running multiple miles. Wilson did in both his ACL's under Howe but aye... Link to post Share on other sites More sharing options...
Mike Posted July 4, 2022 Share Posted July 4, 2022 On 01/07/2022 at 14:28, Optimistic Nut said: I’m going with 17 league apps… He seems sound as fuck, tbf. Really hope he gets a full season. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now